Neon R/T L4-2.0L VIN F HO (2001)
2. Install 3rd gear caged needle bearing (Fig. 123).
3. Install 3rd gear and 3-4 synchronizer onto input shaft. Install Tool #C-3717 over input shaft and press on synchronizer hub and 3rd gear (Fig.
124). The synchronizer hub has the letter U stamped on the top face of the hub. This designates that the hub must be installed with the U facing
upward.
4. Install 3-4 synchronizer snap ring into slot on input shaft.
5. Install blocking ring into 3-4 synchronizer. Install 4th gear caged needle bearing.
6. Install 4th gear onto input shaft.