RAM 1500 Truck 2WD V8-4.7L (2008)
1. Slide center bearing (1) and boot collar (2) on shaft.
2. Install boot collar (2) and center bearing (1) with Installer 6448A.
3. Clean shaft splines and apply a coat of multi-purpose grease.
4. Align master splines and slide front and rear half-shafts together.