RAM 1500 Truck 2WD V8-5.7L VIN 2 (2006)
6. ^
Step 1 - 27 Nm (20 ft. lbs.) torque.
7. ^
Step 2 - Turn main cap bolts an additional 90°.
8. Install the crossbolts with new washer/gasket.
Starting with crossbolt A torque each crossbolt to 28 Nm ( 21 ft. lbs.) torque.
9. Repeat crossbolt torque procedure.
10. Measure crankshaft end play.
11. Position the connecting rods onto the crankshaft and install the rod bearing caps.