dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Integrated Power Module|Page 145 > < Integrated Power Module|Page 143
Page 3
background image

4. Install the IPM retaining bolt (2) and screw (3).
5. Connect the gray connector on the IPM housing.
6. Install the B+ terminal cable and nut on the B+ terminal.
7. Install the IPM cover (4) and tighten the retaining screw (1).
8. Connect the battery negative cable.

Integrated Power Module|Page 145 > < Integrated Power Module|Page 143