RAM 1500 Truck 2WD V8-5.9L VIN Z LDC (1999)
Tensioner Dowel Hole-5.9L HDC-Gas And 8.0L V-10 Engines
2. Install tensioner assembly to mounting bracket. A dowel pin is located on back of tensioner. Align this to dowel hole in tensioner mounting
bracket. Tighten bolt to 41 Nm (30 ft. lbs.) torque.
3. Install drive belt.
5.9L DIESEL ENGINE
REMOVAL
1. Remove accessory drive belt.
2. Remove tensioner mounting bolt and remove tensioner.
WARNING: BECAUSE OF HIGH SPRING PRESSURE, DO NOT ATTEMPT TO DISASSEMBLE AUTOMATIC TENSIONER.
UNIT IS SERVICED AS AN ASSEMBLY.
INSTALLATION
1. Install tensioner assembly to mounting bracket. A dowel is located on back of tensioner. Align this dowel to hole in tensioner mounting bracket.
Tighten bolt to 41 Nm (30 ft. lbs.) torque.
2. Install drive belt.