dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Battery Cables - Removal|Page 10068 > < Battery Cables - Removal|Page 10066
Page 6
background image

3. Raise the vehicle on a hoist,  See: Maintenance/Vehicle Lifting/Service and Repair .
4. Install the nut securing the cable to the starter solenoid (5) and secure the terminal cover (4) in place.
5. Install the stud bolt (3) securing the cable to the engine.
6. Lower the vehicle.

7. Install the battery positive cable terminal clamp (5).
8. Install the right battery positive cable terminal (6) onto the left cable terminal clamp (5).
9. Install the nut (8) securing the right cable terminal (6) to the left positive battery cable terminal clamp (5).

10. Connect the battery negative cable terminal clamps (1 and 9).
11. Check the vehicle for normal operation.

POSITIVE - DIESEL ENGINE - RIGHT

1. Position the right battery positive cable (13) in the vehicle.

Battery Cables - Removal|Page 10068 > < Battery Cables - Removal|Page 10066