RAM 2500 Truck 2WD L6-359 5.9L DSL Turbo VIN D FI (1997)
18.
Using a ball peen hammer and a small punch, drive the throttle rod ball stud from the secondary bellcrank (Figure 4).
19.
Install a new throttle rod ball stud as shown in Figure 5. Tighten ball stud nut to 80 in. lbs. (9 Nm).