RAM 2500 Truck 2WD L6-359 5.9L DSL Turbo VIN D FI (1997)
17. Install shift rail through fork and into case bore.
18. Install shift lever on sector shaft. Then install lever washer and nut on sector shaft. Apply Loctite 242 to nut before installation and tighten nut to
27 - 34 Nm (20 - 25 ft. lbs.) torque.
19. Install magnet in case pocket.