RAM 2500 Truck 2WD L6-5.9L DSL Turbo (2008)
17. Install engine cover (1).
18. Connect negative battery cable.
19. Fill cooling system See: Engine, Cooling and Exhaust/Cooling System/Service and Repair .
Removal-Pick Up Models
REMOVAL-PICK UP MODELS
The EGR Cooler Bypass Valve Assembly (1) is mounted between the EGR crossover tube and the EGR cooler. Two mechanical cables (3) join the units
together. An electrical drive servo (4) moves the cables (3) to operate a butterfly plate (2) within a cast manifold.
Parts 1, 2, 3 and 4 are serviced as one entire assembly. Do not attempt to disassemble unit.
1. Disconnect and isolate both negative battery cables at both batteries.