RAM 2500 Truck 2WD L6-5.9L DSL Turbo VIN 7 (2001)
17. Install engine oil dipstick to engine.
18. Connect 2 electrical cables to cable mounting studs.
19. Connect electrical connector to bottom of APPS by pushing connector upward until it snaps into position.
20. Connect wiring harness (clip) at bottom of Accelerator Pedal Position Sensor (APPS) mounting bracket (Fig. 40).
21. Connect front wiring clip (Fig. 41) to cable bracket housing.
22. Install cable cover (Fig. 39).
23. Connect both negative battery cables to both batteries.
24. Bleed air from fuel system. Do this at fuel injector ends of lines. Use cylinders numbers 1, 3 and 4 for bleeding . (Refer to FUEL SYSTEM/FUEL
DELIVERY - STANDARD PROCEDURE). After bleeding, tighten fittings to 38 Nm (28 ft. lbs.) torque.
25. Check lines/fittings for leaks.