dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Valve Body, A/T|Removal|Page 3799 > < Valve Body, A/T|Removal|Page 3797
Page 8
background image

3. Position detent ball on end of spring. Then hold detent ball and spring in detent housing with Retainer Tool 6583 (Fig. 310). 
4. Install throttle lever in upper housing. Then install manual lever over throttle lever and start manual lever into housing. 
5. Align manual lever with detent ball and manual valve. Hold throttle lever upward. Then press down on manual lever until fully seated. Remove

detent ball retainer tool after lever is seated. 

6. Then install manual lever seal, washer and E-clip. 

7. Verify that throttle lever is aligned with end of kickdown valve stem and that manual lever arm is engaged in manual valve (Fig. 311). 
8. Position line pressure adjusting screw in adjusting screw bracket. 
9. Install spring on end of line pressure regulator valve. 

10. Install switch valve spring on tang at end of adjusting screw bracket. 
11. Install manual valve. 
12. Install throttle valve and spring. 
13. Install kickdown valve and detent. 
14. Install pressure regulator valve. 
15. Install switch valve. 
16. Position adjusting screw bracket on valve body. Align valve springs and press bracket into place. Install short, upper bracket screws first and long

bottom screw last. Verify that valve springs and bracket are properly aligned. Then tighten all three bracket screws to 4 Nm (35 inch lbs.) torque. 

17. Perform Line Pressure and Throttle Pressure adjustments.
18. Lubricate solenoid case connector O-rings and shaft of manual lever with light coat of petroleum jelly. 

Valve Body, A/T|Removal|Page 3799 > < Valve Body, A/T|Removal|Page 3797