RAM 2500 Truck 2WD L6-5.9L DSL Turbo VIN 7 (2001)
NOTE: The bearing rotating torque should be constant during a complete revolution of the pinion. If the rotating torque varies, this indicates a
binding condition.
9. Install the propeller shaft with the installation reference marks aligned.
10. Tighten the universal joint yoke clamp screws to 19 Nm (14 ft. lbs.).
11. Install the brake drums.
12. Add gear lubricant to the differential housing, if necessary. Refer to the Lubricant Specifications for gear lubricant requirements.
13. Install wheel and tire assemblies and lower the vehicle.