RAM 2500 Truck 2WD L6-5.9L DSL Turbo VIN 7 (2001)
7. Seat yoke on pinion shaft with Installer D-191 and Yoke Holder 6719 (Fig. 23).
8. Remove the tools and install the pinion yoke washer and nut.
9. Hold pinion yoke with Yoke Holder 6719 and tighten shaft nut to 597 Nm (440 ft. lbs.) (Fig. 24). Rotate pinion shaft several revolutions to ensure
the bearing rollers are seated.