RAM 2500 Truck 2WD L6-5.9L DSL Turbo VIN C (2002)
6. Discard CMP O-ring.
INSTALLATION
1. Install new O-ring to CMR Apply clean engine oil to O-ring.
2. Clean area around CMP mounting hole.
3. To prevent tearing O-ring, install CMP into gear housing using a twisting action.
4. Install mounting bolt and tighten to 20 Nm (15 ft. lbs.) torque.
5. Install electrical connector to CMP.
6. Connect both negative cables to both batteries.