RAM 2500 Truck 2WD L6-6.7L DSL Turbo (2010)
1. Install new O-ring seal (1) in groove (2) on water pump (3).
2. Install water pump (2) with the weep hole facing downward. Tighten mounting bolts (1) to 24 Nm (18 ft. lbs.) torque.
3. Install generator assembly See: Starting and Charging/Charging System/Alternator/Service and Repair/Generator - Installation.
4. Install accessory drive belt See: Engine/Drive Belts, Mounts, Brackets and Accessories/Drive Belt/Service and Repair/Serpentine Accessory Drive
Belt - Installation.
5. Install air box and tube assembly. For 5.9L Diesel,See: Engine/Tune-up and Engine Performance Checks/Air Cleaner Housing/Service and
Repair/Air Cleaner Body - Installation. For 6.7L Diesel, See: Engine/Tune-up and Engine Performance Checks/Air Cleaner Housing/Service and
Repair/Air Cleaner Body - Installation.
6. Install air filter housing See: Engine/Tune-up and Engine Performance Checks/Air Cleaner Housing/Service and Repair/Air Cleaner Body -
Installation.
7. Evacuate air and refill cooling system.See: Procedures/Water Pump - Coolant Air Evacuation
8. Connect both battery cables.
9. Start and warm the engine. Check for leaks. See: Testing and Inspection/Leak Testing