dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Campaign - AC Control Programming/Air Door Actuators|Page 5609 > < Campaign - AC Control Programming/Air Door Actuators|Page 5607
Page 8
background image

            
2. Disconnect the negative battery cable.        
        
3. Remove the instrument panel from the cowl panel using the following procedure:

a. Remove the left kick panel (Figure 5).

b. Remove the steering column knee bolster panel (Figure 5).

c. Disconnect the park brake release handle link at the park brake pedal assembly.

d. Disconnect the instrument panel wiring harness connectors, located above the brake pedal, from the bulkhead wiring harness connector and the

electrical connectors from the steering column.

e. Remove the four steering column retaining bolts and lower the steering column.

f.

Remove the left "A" pillar trim panel (grab handle) and disconnect the two electrical connectors located behind trim panel.

g. Using a trim stick (C-4755 or equivalent) remove the left instrument panel side cover.

h. Remove the three bolts that secure the left side of the instrument panel to the dash panel (Figure 6).

i.

If equipped, remove the floor console.

j.

Remove the two brake sled-to-instrument panel bolts

Campaign - AC Control Programming/Air Door Actuators|Page 5609 > < Campaign - AC Control Programming/Air Door Actuators|Page 5607