RAM 2500 Truck 2WD L6-6.7L DSL Turbo (2010)
7. If equipped, position back the transmission fill tube (2) to the EGR cooler (1) finger tight.
8. Tighten nuts (1) on the EGR cooler inlet flange to the exhaust manifold to 60 Nm (44 ft. lbs.).
9. Using a crisscross pattern, tighten bolt (2) and (3) to 24 Nm 18 ft. lbs.) to secure the EGR cooler onto the EGR cooler mounting bracket.