RAM 2500 Truck 2WD L6-6.7L DSL Turbo (2010)
1. Clean each end of EGR crossover tube and its connection points of any old gasket material.
2. Install new gaskets to each end of the EGR crossover tube (2).
3. Position EGR crossover tube (2) to engine.
4. Install bolt (5) finger tight at center bottom of EGR crossover tube.
5. First, tighten EGR tube clamp (1) to 10 Nm (89 in. lbs.), then tighten clamp (3) to 10 Nm (89 in. lbs.).
6. Tighten bolt (5) to 10 Nm (89 in. lbs.).
7. Connect the EGR temperature sensor harness connector (4).
8. Install the EGR crossover tube cover (2). Tighten bolts (1) to 10 Nm (89 in. lbs.).
9. Connect both negative battery cables.