RAM 2500 Truck 2WD L6-6.7L DSL Turbo (2010)
Integrated Accessory Switch Assembly: Service and Repair
Instrument Cluster Switch Pod - Installation
INSTALLATION
1. Align the switch pod to the instrument panel center bezel.
2. Install the upper switch pod fasteners (1) to the center bezel.
3. Connect the switch pod electrical connector.
4. Install the instrument panel center bezel, See: Body and Frame/Interior Moulding / Trim/Dashboard / Instrument Panel/Service and
Repair/Instrument Panel Bezel - Installation.
5. Connect the negative battery cable.