dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Campaign - PCM Connector Seals|Page 2080 > < Campaign - PCM Connector Seals|Page 2078
Page 10
background image

22.

Continue with Section F - PCM/Vehicle Data Set-up.

E. Replace Headlamp & Dash Harness (Typical)

NOTE

Only those vehicles that have corrosion found during the inspection in Section A. require wiring harness replacement. Very few vehicles are expected
to require wiring harness replacement.

1.

Remove the air cleaner assembly.

2.

Disconnect the affected PCM electrical connectors (if necessary).

3.

Disconnect the following items located in the engine compartment as necessary:

a.

ignition switch.

b.

vehicle speed sensor.

c.

A/C pressure sensor.

d.

A/C clutch relay

e.

oxygen sensors.

f.

ASD relay.

g.

radiator fan relay.

h.

clutch interlock switch.

i.

brake switch.

j.

Autostick switch.

k.

fuel pump relay.

l.

starter relay.

m.

transaxle solenoid connector.

n.

input and output speed sensor.

o.

PRNDL switch connector.

p.

For PT and JR vehicles: Remove the front fascia.

q.

headlamps.

r.

turn signal lamps.

4.

Remove the old wiring harness from the vehicle.

5.

Place the new wiring harness into position.

6.

Connect the wiring harness to the following items located in the engine compartment as necessary:

a.

ignition switch.

b.

vehicle speed sensor.

c.

A/C pressure sensor.

d.

A/C clutch relay

e.

oxygen sensors.

Campaign - PCM Connector Seals|Page 2080 > < Campaign - PCM Connector Seals|Page 2078