dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Connecting Rod, Engine > < Fitting Connecting Rod Bearings
Page 1
background image

Connecting Rod Bearing: Service and Repair
Connecting Rod Bearing Clearance

Engine connecting rod bearing clearances can be determined by use of Plastigage, or equivalent. The following is the recommended procedure for the
use of Plastigage:

1. Remove oil film from surface to be checked. Plastigage is soluble in oil.

Placement Of Pastigage In Bearing Shell

2. Place a piece of Plastigage across the entire width of the bearing cap shell. Position the Plastigage approximately 6.35 mm (1/4 inch) off center

and away from the oil holes. In addition, suspect areas can be checked by placing the Plastigage in the suspect area.

3. The crankshaft must be rotated until the connecting rod to be checked starts moving toward the top of the engine. Only then should the rod cap,

with Plastigage in place, be assembled. Tighten the rod cap nut to 61 Nm (45 ft. lbs.) torque. DO NOT rotate the crankshaft or the Plastigage may
be smeared, giving inaccurate results.

Clearance Measurement

4. Remove the bearing cap and compare the width of the flattened Plastigage with the scale provided on the package. Plastigage generally comes in

two scales (one scale is in inches and the other is a metric scale). Locate the band closest to the same width. This band shows the amount of
clearance. Differences in readings between the ends indicate the amount of taper present. Record all readings taken. Refer to Engine
Specifications.

5. Plastigage is available in a variety of clearance ranges. The 0.025-0.076 mm (0.001-0.003 inch) range is usually the most appropriate for checking

engine bearing clearances.

Connecting Rod, Engine > < Fitting Connecting Rod Bearings