dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Valve Body, A/T|Removal|Page 3945 > < Valve Body, A/T|Removal|Page 3943
Page 7
background image

at center and working outward. 

3-4 ACCUMULATOR

1. Position converter clutch valve and 3-4 shift valve springs in housing (Fig. 308). 
2. Loosely attach accumulator housing with right side screw (Fig. 308). Install only one screw at this time as accumulator must be free to pivot

upward for ease of installation. 

3. Install 3-4 shift valve and spring. 
4. Install converter clutch timing valve and spring. 
5. Position plug on end of converter clutch valve spring. Then compress and hold springs and plug in place with fingers of one hand. 
6. Swing accumulator housing upward over valve springs and plug. 

7. Hold accumulator housing firmly in place and install remaining two attaching screws. Be sure springs and clutch valve plug are properly seated

(Fig. 309). Tighten screws to 4 Nm (35 inch lbs.)

VALVE BODY FINAL

1. Install boost valve, valve spring, retainer and cover plate. Tighten cover plate screws to 4 Nm (35 inch lbs.) torque. 
2. Insert manual lever detent spring in upper housing. 

Valve Body, A/T|Removal|Page 3945 > < Valve Body, A/T|Removal|Page 3943