RAM 2500 Truck 4WD V8-5.7L VIN D (2005)
3. Using special tool#9065 (1,3,), compress valve spring and install valve spring retainer and locks.
4. Release air charge in cylinder (1).
5. Remove spring compressor tool #9065 (3).
CAUTION: Verify that the pushrods are fully seated into lifter and rocker arm. Recheck after rocker arm shaft has been torqued to specification.
6. Install rocker arm shaft and pushrods.