dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Evaporative Check Valve > < Component Description|Page 2069
Page 1
background image

Canister Purge Solenoid: Testing and Inspection

-

In the RUN or START position, the ignition switch connects circuit A1 from the fuse block and circuit A21. Circuit A1 connects to battery voltage
and is protected by fuse 7 in the Power Distribution Center (PDC).

-

Circuit A21 splices to supply battery voltage to the EGR solenoid, Torque Converter Clutch (TCC) solenoid, overdrive solenoid, data link
connector and provides an input to the PCM.

Evaporative Check Valve > < Component Description|Page 2069