RAM 2500 Van V8-5.2L Prop VIN 2 (2000)
2. Install the grab handle.
3. Install the bolts and tighten to 6 N.m (55 in. lbs.).
4. Install the bolt plugs.
LEFT SIDE
1. Install the trim and snap push-in fasteners into A-pillar.
2. Install the grab handle.
3. Install the bolts and tighten to 6 N.m (55 in. lbs.).
4. Install the bolt plugs.
LEFT SIDE
1. Install the trim and snap push-in fasteners into A-pillar.