dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Recall - ABS Wiring Corrosion|Page 4699 > < Recall - ABS Wiring Corrosion|Page 4697
Page 12
background image

9.

Install the battery onto the new battery tray.

10.

Install the "J" hook and battery hold down bracket.

11.

Install the battery hold down retaining nuts. Tighten the nuts to 24 in. lbs. (2.7 N.m).

12.

Connect the positive battery cable to the positive battery post. Tighten the retaining nut to 70 in. lbs. (7.9 N.m).

13.

Connect the negative battery cable to the negative battery post. Tighten the retaining nut to 70 in. lbs. (7.9 N.m).

14.

From inside the left wheel well housing, secure the battery tray drain tube to the frame rail bracket with the provided plastic tie strap (Figure 16).

15.

If the ABS control module was replaced, connect the DRB III scan tool to the vehicle and program the rear axle ratio and tire size into the new
control module.

Recall - ABS Wiring Corrosion|Page 4699 > < Recall - ABS Wiring Corrosion|Page 4697