RAM 2500 Van V8-5.2L VIN Y (1998)
3. Install throttle body to intake manifold.
4. Install four mounting bolts. Tighten bolts to 23 N.m (200 in. lbs.) torque.
5. Install control cables.
6. Install vacuum line to throttle body
7. Install electrical connectors.
8. Install air cleaner.