RAM 2500 Van V8-5.9L VIN Z (1997)
Canister Purge Solenoid: Testing and Inspection
-
In the RUN or START position, the ignition switch connects circuit Al from the Power Distribution Center (PDC) and circuit A21. Circuit A21
feeds circuit F18 through fuse 19 in the fuse block.
-
Circuit F18 splices to supply battery voltage to the TCC solenoid and provides an input to cavity A2 of the PCM.