RAM 3500 Truck 2WD L6-359 5.9L DSL Turbo VIN D FI (1998)
6. Support adapter on 3-4 small wood blocks. Position blocks under transmission mounting surface of front case and between studs.
7. Remove poppet plunger screw.
Poppet And Spring Removal
8. Remove spring and poppet plunger.
Loosening Shift Lever Nut
Shift Lever, Nut And Washer Removal
9. Loosen nut and washer that attach shift lever to sector shaft. Then remove, nut, washer and lever from sector shaft.