dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Duty Cycle EVAP/Purge Solenoid|Page 3283 > < Duty Cycle EVAP/Purge Solenoid|Page 3281
Page 1
background image

Canister Purge Solenoid: Testing and Inspection

-

In the RUN or START position, the ignition switch connects circuit A1 from the Power Distribution Center (PDC) and circuit A21. Circuit A21
feeds circuit F18 through fuse 9 in the fuse block.

-

Circuit F18 splices to supply battery voltage to the EGR solenoid and connects to cavity A2 of the PCM.

Duty Cycle EVAP/Purge Solenoid|Page 3283 > < Duty Cycle EVAP/Purge Solenoid|Page 3281