RAM 3500 Truck 2WD V8-5.7L (2008)
3. Remove four mounting bolts (4) and (6) and remove air flow control valve (5).
4. Remove gasket (3) and discard.
Installation
INSTALLATION
The EGR Air Flow Control Valve (5) is bolted to the end of the air intake connection (2).
1. Obtain new gasket (3). Before positioning new gasket (3), be sure to clean mating surfaces at top of air flow control valve and bottom of air intake
connection (2).
2. Install four mounting bolts (4) and (6). Tighten four bolts to 18 Nm (13 ft. lbs.) (160 in. lbs.) torque.