dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Charging System > < Battery Holddown|Page 5425
Page 2
background image

9. Final tighten the four nuts with washers that secure the battery tray support to the stud plates on the front wheelhouse inner panel. Tighten the nuts

to 15.8 Nm (140 in. lbs.).

10. If the left battery tray is being installed, install the battery temperature sensor onto the left battery tray. Refer to Battery Temperature Sensor

installation procedures.

11. Install the battery onto the battery tray. Refer to Battery installation procedures.

Charging System > < Battery Holddown|Page 5425