dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Heated Mirror Relay > < Heated Element, Mirror|Locations|Page 6661
Page 1
background image

Heated Element: Testing and Inspection

Heated Mirror Grid Test

1. Disconnect and isolate the battery negative cable. Disconnect the door wire harness connector from the power mirror wire harness connector at the

power mirror with the inoperative heating grid.
Check for continuity between the ground circuit cavity in the door wire harness connector for the power mirror and a good ground.
If OK, go to Step 2.
If not OK, repair the open ground circuit to ground as required.

2. Reconnect the battery negative cable. Turn the ignition switch to the ON position. Turn ON the heated mirror system.

Check for voltage (battery voltage less the resistance in the outside mirror heating grid that is still connected) at the fused heated mirror relay
output circuit cavity in the door wire harness connector for the power mirror.
If OK, go to Step 3.
If not OK, repair the open fused heated mirror relay output circuit to the heater and air conditioner control unit as required.

3. Check the outside mirror heating grid by testing for continuity between the ground circuit and the fused heated mirror relay output circuit cavities

in the power mirror wire harness connector. There should be continuity.
If not OK, replace the faulty power mirror.
If OK, check the resistance through the outside mirror heating grid.
The correct resistance should be from 10 to 16 ohms when measured at an ambient temperature of 21 °C (70 °F).
If not OK, replace the faulty power mirror.

Heated Mirror Relay > < Heated Element, Mirror|Locations|Page 6661