RAM 3500 Truck 4WD L6-5.9L DSL Turbo VIN C (2002)
3. Apply Mopar Gasket Maker or equivalent to the sealing surface of the transmission. Do not over apply sealant.
4. Install isolator plate onto the transmission, metal side down.
5. Install shift tower onto the isolator plate. No sealant is necessary between the shift tower and isolator plate.
6. Verify shift tower, isolator plate and shift tower bushings are properly aligned.
7. Install shift tower bolts and tighten the shift tower bolts to 8 - 10 Nm (7 - 9 ft. lbs.).
8. Install shift lever extension, shift boot and bezel.