dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Lamps and Indicators - Engine > < Procedures
Page 1
background image

Intake Manifold: Removal and Replacement

Intake Manifold - Removal

REMOVAL

1. Disconnect the batteries. See: Starting and Charging/Battery/Battery Cable/Service and Repair/Battery Cables - Removal
2. Disconnect the EGR air Transfer tube temperature sensor.
3. Disconnect the EGR Valve Actuator Connector
4. Disconnect the Engine Oil level tube at the Air Inlet bracket
5. Loosen the CAC Outlet tube clamps at the CAC Outlet and Air Inlet and remove the tube. See: Powertrain Management/Fuel Delivery and Air

Induction/Turbocharger/Intercooler/Service and Repair/Removal

6. Loosen and remove both v-band clamps at each end of the Air Transfer tube
7. Remove the P-clip mounting capscrew
8. Remove the Air Transfer tube
9. Loosen and remove six (6) Air Inlet mounting capscrews.

10. Remove the air inlet.
11. Remove the injector fuel lines.
12. Disconnect the Fuel Rail Pressure sensor at the rear of the fuel rail manifold.
13. Remove the High Pressure fuel line from the dump/overflow valve.
14. Remove the fuel rail.
15. Remove the grid heater wiring connector.
16. Disconnect the MAP sensor.
17. Remove the intake manifold capscrews.
18. Remove the intake manifold.

Intake Manifold - Installation

INSTALLATION

1. Clean the Intake Manifold and Cylinder Head Gasket area.
2. Install a new intake manifold gasket.
3. Position the intake manifold and Install the intake manifold capscrews finger tight.
4. Position the fuel rail and install the fuel rail manifold capscrews finger tight.
5. Torque the intake manifold capscrews to 24 N.m (18 ft. lbs.).
6. Connect the fuel rail pressure sensor.
7. Connect the intake manifold grid heater. Torque the capscrew to 10 N.m (89 in. lbs.).
8. Install the fuel lines. See: Powertrain Management/Fuel Delivery and Air Induction/Fuel Supply Line/Service and Repair/Installation
9. Torque the fuel rail mounting capscrews to 24 N.m (18 ft. lbs.).

10. Clean the Air Inlet gasket area.
11. Clean the Intake Manifold to air inlet area.
12. Install the new Air Intake connection gasket.
13. Install the air intake connection to the intake manifold
14. torque the intake manifold to 24 N.m (18 lbs. ft.).
15. Install the Oil Level Gauge tube and torque to 24 N.m (18 lbs. ft.).
16. Clean the gasket area of the Air Transfer Tube (both ends).
17. Clean the EGR cooler and EGR control valve gasket area.
18. Using new gaskets, install the Air Transfer Tube.
19. Install the V-band clamps.
20. Install the P-clip to the bracket. Torque the mounting capscrew to 24 N.m (18 lbs. ft.).
21. Torque the V-band clamps to 10 N.m (89 lbs. in.).
22. Connect the EGR Valve Actuator connector.
23. Connect the EGR Gas Temperature connector.
24. Connect the batteries.
25. Start the engine and check for leaks.

Lamps and Indicators - Engine > < Procedures