dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Procedures|Page 8411 > < Procedures|Page 8409
Page 20
background image

2. Position assembled transfer plate and upper housing separator plate (2) on upper housing. Be sure filter screen (1) is seated in proper housing

recess.

3. Install the Number 10 check ball (1) into the transfer plate. The check ball is approximately 4.8 mm (3/16 in.) in diameter.

4. Position lower housing separator plate (3) on transfer plate (2).

Procedures|Page 8411 > < Procedures|Page 8409