Ram Raider V6-2972cc 3.0L SOHC (1989)
Rollover/Pressure Relief Valve: Testing and Inspection
Overfill Limiter (Two-way Valve) Operation
1.
Remove the overfill limiter mounting bolt.
2.
Disconnect the vapor hoses, and then remove the over fill limiter.
3.
Blow lightly into the inlet and the outlet. If air passes through after a slight resistance, then the valve is good. If air does not pass through or there
is no initial resistance, replace the valve. See: Service and Repair