dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Windshield Header Moulding Removal|Page 5283 > < Windshield Header Moulding Removal|Page 5281
Page 5
background image

15. Install top header trim panel.

Second Roof Bow and Linkage Removal

SECOND ROOF BOW AND LINKAGE REMOVAL

1. Lower convertible top.

Second Roof Bow

2. Remove E-clip and clevis pin holding second roof how pivot link to top header.
3. Remove screws holding second roof bow actuating link to pivot link.

Second Roof Bow Retainer

4. Remove screws holding second roof bow to top cover listing retainer.
5. Remove staples holding stay pads to second roof bow.
6. Separate second roof bow from top frame.

INSTALLATION

1. Position second roof bow on convertible top.
2. Staple stay pads to second roof bow tack strip in same locations as the original assembly.
3. Install screws to hold top cover listing retainer to second roof bow.
4. install screws washers and spacers to hold roof bow actuating link to pivot link.
5. Install clevis pins and E-clips to hold second roof bow pivot link to top header.
6. Verify convertible top operation.

Third Roof Bow Removal

THIRD ROOF BOW REMOVAL

1. Disengage top header latch.
2. Lower convertible top halfway down
3. Remove bolts holding third roof bow to rear roof rails.
4. Separate third roof bow from rear roof rails.
5. Rotate third roof bow to gain access to staples holding stay pads to tack strip.
6. Remove staples holding stay pads to third roof bow.

Windshield Header Moulding Removal|Page 5283 > < Windshield Header Moulding Removal|Page 5281