Sprinter 2500 L5-2.7L DSL Turbo (2003)
Heat guide rail (4) to approx. 60 degrees C and take off
Installation: Replace guide rail (4). Clean contact surface before installing and pull protective sheet off adhesive strip of guide rail
6
Install in the reverse order