Sprinter 2500 L5-2.7L DSL Turbo (2003)
4. Connect ends of new oil pump chain with new riveted link (Fig. 57).
NOTE: When assembling riveting tool, one piece is secured by a screw and the other can move loosely on the thrust spindle.
5. Assemble riveting tool by attaching inserts. (Fig. 58).
NOTE: The outer plate will be held in place by a magnet.
6. Place new outer plate into tool insert.
NOTE: Ensure that the riveted link and riveting tool are aligned.
7. Position riveting tool over new link and press in new rivet as far as the tool stop.
8. Remove riveting tool to change inserts.
9. Install insert on riveting tool and secure with screw.