Sprinter 2500 V6-3.0L DSL Turbo VIN 45 (2007)
1. Carefully grind remaining sheet metal (5) off of A-pillar inner section (4).
Preparing waist rail paneling for installation
The following steps apply for the right side of the of waist rail paneling (1) and must be performed on the left side with locations reversed.
1. Mark holes with the following gaps:
a = 25 mm,