dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Distribution - Front|Page 5306 > < Distribution - Front
Page 2
background image

NOTE:  Take the proper precautions to protect the front face of the instrument panel from cosmetic damage during this service procedure.

1. Position the defroster and instrument panel ducts (2) into the instrument panel and engage them to the HVAC housing. Make sure the ducts are

fully engaged to the housing.

2. Install the screws (1) that secure the ducts to the instrument panel. Tighten the screws to 2 Nm (17 in. lbs.).
3. Install the two covers onto the top of the instrument panel.
4. Install the instrument panel assembly.

5. Remove the tape or plugs from the opened refrigerant line fittings and expansion valve and heater core ports. ports.
6. Lubricate new rubber O-ring seals with clean refrigerant oil and install them on the refrigerant line fittings. Use only the specified O-rings as they

are made of a special material for the R-134a system. Use only refrigerant oil of the type recommended for the A/C compressor in the vehicle.

CAUTION:  Use care when installing the A/C lines to the A/C expansion valve. Carefully align the tube ends with the valve prior to
tightening the A/C line retaining nut or damage to the sealing rings and tube ends may occur.

7. Install the A/C liquid line (1) and the A/C suction line (2) onto the A/C expansion valve.
8. Install the nut (3) that secures the A/C liquid line and the A/C suction line to the A/C expansion valve. Tighten the nut to 6 Nm (53 in. lbs.).
9. Connect the heater hoses (4) to the heater core. Tighten the clamps securely.

10. Install the air cleaner housing.
11. Reconnect the negative battery cable.
12. Refill the engine cooling system.
13. Evacuate the refrigerant system.
14. Charge the refrigerant system.

Distribution - Front|Page 5306 > < Distribution - Front