Sprinter 3500 V6-3.0L DSL Turbo (2008)
4. Install fuel lines (1).
5. Connect the WIF wiring harness connector (2).
6. Connect negative battery cable.
7. Cycle ignition several times to build pressure.
8. Start engine and inspect for leaks.
4. Install fuel lines (1).
5. Connect the WIF wiring harness connector (2).
6. Connect negative battery cable.
7. Cycle ignition several times to build pressure.
8. Start engine and inspect for leaks.