dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Coolant Supply Line|Page 1562 > < Coolant Supply Line|Page 1560
Page 3
background image

COOLANT SUPPLY LINE 

1. If brass fitting was removed from engine block, apply thread sealer to threads and install in engine block. Torque brass fitting to 41 Nm (30 ft.

lbs.). 

2. Position coolant supply line to mounting location.
3. Install NEW washers on banjo fitting of coolant supply line (Fig. 24). Hand start banjo bolt.
4. Hand start flared fitting of coolant supply line.

5. Torque banjo fitting bolt to 37 Nm (27 ft. lbs.) (Fig. 26).

6. Torque flared fitting to 31 Nm (23 ft. lbs.) (Fig. 24).
7. Lower vehicle.
8. Fill cooling system.

Coolant Supply Line|Page 1562 > < Coolant Supply Line|Page 1560