Stealth R/T Turbo V6-2972cc 3.0L DOHC Turbo (1996)
ABS Main Relay: Testing and Inspection
1. Remove relay box cover in engine compartment, then the power relay.
Fig 74 Power Relay Inspection
Fig 75 ABS Power Relay Continuity Chart
2. Apply battery voltage to terminal 1 and check for continuity between terminals as shown, with terminal 3 short-circuited to ground.
3. If continuity is not as specified, replace power relay.