Stealth R/T Turbo V6-2972cc 3.0L DOHC Turbo (1996)
Power Transistor No. 1 Test
2. Connect the negative lead of a 1.5 volt battery to terminal # 4 of the power transistor.
3. Connect the positive lead of an ohmmeter to terminal # 13, and the negative lead of the ohmmeter to terminal # 4. There should be NO
continuity.
4. Check for continuity when the positive lead of the battery is connected to terminal # 3 of the power transistor. There should be continuity only
while the battery is connected.
Power Transistor No. 2 Test
5. Connect the negative lead of a 1.5 volt battery to terminal # 4 of the power transistor.
6. Connect the positive lead of an ohmmeter to terminal # 12, and the negative lead of the ohmmeter to terminal # 4.
Continuity should NOT exist.
7. Check for continuity when the positive lead of the battery is connected to terminal # 2 of the power transistor. Continuity should exist, while the
battery is connected.
Power Transistor No. 3 Test
8. Connect the negative lead of a 1.5 volt battery to terminal # 4 of the power transistor.
9. Connect the positive lead of an ohmmeter to terminal # 11, and the negative lead of the ohmmeter to terminal # 4. There should be NO
continuity.
10. Check for continuity when the positive lead of the battery is connected to terminal # 1 of the power transistor. There should be continuity only
while the battery is connected.
Replace the power transistor if there is a deviation in the test results.