dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Component Tests and General Diagnostics|Page 2285 > < Component Tests and General Diagnostics|Page 2283
Page 90
background image

Q:  Is the wiring harness between power window main switch connector E-12 (terminal 2) and power window sub-switch connector E-05 (terminal 7)
in good condition?

YES :  No action is necessary and testing is complete. 

NO :  The wiring harness may be damaged or the connector(s) may have loose, corroded or damaged terminals, or terminals pushed back in the
connector. Repair the wiring harness as necessary. The passenger's power window function should work now normally.

STEP 8. Check the ground circuit to the power window sub-switch. Test at power window sub-switch connector E-05.

1. Disconnect power window sub-switch connector E-05 and measure the resistance available at the harness side of the connector.

2. Measure the resistance value between terminal 5 and ground. 

-

The resistance should be 2 ohms or less.

Q: Is the measured resistance 2 ohms or less?

YES : Go to Step 11. 

NO :  Go to Step 9.

Component Tests and General Diagnostics|Page 2285 > < Component Tests and General Diagnostics|Page 2283