dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Body and Frame|Locks > < Procedures|Page 6042
Page 18
background image

INSTALLATION 

1. Position upper deck molding on vehicle.
2. Connect wire connector for CHMSL.
3. Install screws attaching upper deck molding to rear deck panel inside decklid water trough.
4. Install screws attaching upper deck molding to rear deck panel above convertible top rear attachment.
5. Raise and secure convertible top.

Body and Frame|Locks > < Procedures|Page 6042