eagle Workshop Repair Guides

Eagle Workshop Service and Repair Manuals

Pulsed Secondary Air Injection|Service and Repair > < Pulse Air Injection Reactor (PAIR)|Page 1309
Page 1
background image

Pulsed Secondary Air Injection: Testing and Inspection

FUNCTIONAL CHECK

1.

Connect hand operated vacuum pump to rubber hose of Pulse Air valve.

2.

Apply 15 inches Hg or greater to valve. If vacuum drops in less than two seconds, replace valve.

Pulsed Secondary Air Injection|Service and Repair > < Pulse Air Injection Reactor (PAIR)|Page 1309