eagle Workshop Repair Guides

Eagle Premier Workshop Service & Auto Repair Manuals

Lamps and Indicators - Cooling System > < Heater Core|Removal|Page 995
Page 2
background image

Fig. 13  Removing Wire From Gearshift Lever Pulley

24. Move gearshift lever to neutral position and check position of shift indicator. If pointer is not aligned with N on display, slide anchor until

indicator is correct. Tighten screw and check for proper positioning of indicator in all positions.

25. Install bulkhead connector and connector attaching screw and connect column connector.
26. Install instrument panel support rod, tighten rod attaching screws and install instrument panel lower trim cover.
27. Connect battery ground cable.
28. Fill cooling system and charge A/C system.

Lamps and Indicators - Cooling System > < Heater Core|Removal|Page 995